To be completed in 2017, the all-in-one Kampung Admiralty includes two blocks of Housing Board studio apartments, centres for medicine, childcare and eldercare, and shops.
Project Information
Greenwave provides our most advanced system to date with AIRWASTE HYBRID SYSTEM.
A mixed development with studio apartment units of 104 units; healthcare, eldercare, childcare and commercial facilities, there will be approximate total pipe length of 250m; 6 Discharge Valves connected to refuse chute; 4 nos. of Hawker Table Top Disposal point; 3 nos. Full-vacuum loading station as well as two fraction with double container system to cater to all the needs of Kampung Admiralty’s facilities.